3.2m² automatic stripping unit mainly includes stripping conveyor line, mechanical pre-opening device, main stripping device, brake device, zinc sheet conveying device, palletizing device and com...
Product center / Product center
  • 发布时间: 2018 - 07 - 23
    The automatic stripping unit is a complete set of equipment for stripping, receiving, conveying, stacking, weighing, and cleaning the zinc plate on the cathode plate.· The automatic stripping unit has two types of stripping for customers to choose: the plate is not moved or the knife is not moved.· Cathode plate transfer is also available in two forms: chain mode or robot mode.
  • 发布时间: 2018 - 07 - 24
    The cathode scrubbing unit is mainly used to thoroughly clean the cathode plate before returning the cathode plate to the electrolytic cell. The utility model is composed of a reversible washing and conveying line and a scrubbing device. The scrubbing device is arranged in the middle of the conveying line, and the two cathode plates are lifted by one washing, and the washing brush is finished by the high-speed rotating washing roller during the lifting process, and is used by the automatic stripping unit.
  • 发布时间: 2018 - 07 - 24
    3.2m2 automatic multi-purpose crane technical parameters
    Zinc electrolysis automatic multi-purpose crane is the key equipment for automatic production of zinc electrolysis. It is mainly used for the tank and anode of the zinc electrolysis workshop, and the trough transfer between the electrolysis tank, the conveying line and the anode trolley. The function of cleaning residual electrolyte and conductive contacts on the electrode plate and finishing the plates is the core equipment of the zinc electrolysis workshop integrating machine (machine), electricity (control) and gas (moving). Our company is the first company in China to successfully develop ...
  • 发布时间: 2018 - 07 - 24
    3.2m2 anode trolley and anode cleaning and leveling unit technical parameters1.4m2 anode cleaning and leveling unit technical specifications and performance indicatorsMain parameters of high pressure water cleaning system
    The anode car and anode cleaning leveling unit in the zinc electrolysis workshop is mainly used for the transfer, cleaning and orthopedics of the anode plate of the zinc electrolysis workshop. This equipment is one of the important equipments in the zinc electrolysis workshop. The zinc electrolysis workshop anode car and anode cleaning leveling unit is mainly composed of anode car, high pressure water cleaning system, anode cleaning and leveling machine, mechanical pretreatment equipment (optional) and so on.Our company is the first enterprise in China to successfully develop anode car and ano...
  • 发布时间: 2018 - 07 - 24
    The zinc casting equipment developed by our company is mainly composed of three main parts: molten zinc induction furnace, ingot unit and palletizing unit. The specific equipment includes: induction furnace, casting device, double-die ingot machine, and ingot conveyor roller. , water-cooled conveyor chain, turning mechanism, zinc ingot grabbing platform, stacking robot (with special fixture), zinc ingot automatic baling device, weighing coding device, ingot conveyor. The equipment has many functions such as melting zinc, casting, ingot casting, palletizing, bundling and weighing.
Contact information

Phone:0731-83572910

Fax:0731-83572995

 


Address: No. 16, Lixiang Middle Road, National Economic and Technological Development Zone, Changsha City, Hunan Province

说明: The CCF flotation column developed by our company was successfully tested in a company for the first time in 2003. After nearly 10 years of development, our company sold nearly 200 flotation columns of various specifications in the region, accounting for more than 90% of the market share in the region; The CCF flotation column has expanded from the initial molybdenum selection operation to the rough selection of molybdenum, greatly expanding the application range of the flotation column.In a 10000t/d molybdenum plant in a certain enterprise, seven flotation columns with diameters of 5.0m, 2.4m, 2.0m, 1.8m, 1.5m and 1.2m are used for the selection of molybdenum and fine selection, of which two 5.0 m flotation column is used to process 10000t/d ore in parallel, which is the largest floating ...
release time: 2018 - 08 - 14
The number of clicks: 71
说明: Three flotation columns with diameters of 3m, 2.2m and 1.8m were used for rough selection, selection and fine sweeping of phosphate rock reverse flotation.
release time: 2018 - 07 - 26
The number of clicks: 45
说明: Four flotation columns with diameters of 1.5m and 1.2m were used for the two series of copper selection sections, replacing the original copper selection of the original flotation machine. In the subsequent new 7000t/d plant, the copper selection operation also adopted our company's flotation column equipment (two sets of 4.0m and 3.0m flotation columns).
release time: 2018 - 07 - 26
The number of clicks: 28
说明: Five flotation columns with a diameter of 4.5m are used for coarse, fine and sweeping operations of copper and nickel in the sorghum workshop. The mine is characterized by a large specific gravity (5.5t/m), high grade (Ni45%, Cu28%), high working concentration (50%), and fineness of ore-280 mesh 90%.
release time: 2018 - 07 - 26
The number of clicks: 75
说明: 9 sets of flotation columns with diameters of 3m, 2.5m, 1.8m, 1.5m and 1.2m are used for molybdenum finishing to recover copper, sulfur and ore fineness -400 mesh 90%. The project is a full flotation column. Process.
release time: 2018 - 07 - 26
The number of clicks: 71
说明: Three flotation columns of 4m, 3.5m and 2.0m in diameter are used in the copper slag selection, copper smelting and re-election of the copper slag selection section, and the ore fineness is -400 mesh 80%.