0731-86407858
News  
Product center / Product center
  • 发布时间: 2018 - 07 - 23
    The automatic stripping unit is a complete set of equipment for stripping, receiving, conveying, stacking, weighing, and cleaning the zinc plate on the cathode plate.· The automatic stripping unit has two types of stripping for customers to choose: the plate is not moved or the knife is not moved.· Cathode plate transfer is also available in two forms: chain mode or robot mode.
  • 发布时间: 2018 - 07 - 24
    The cathode scrubbing unit is mainly used to thoroughly clean the cathode plate before returning the cathode plate to the electrolytic cell. The utility model is composed of a reversible washing and conveying line and a scrubbing device. The scrubbing device is arranged in the middle of the conveying line, and the two cathode plates are lifted by one washing, and the washing brush is finished by the high-speed rotating washing roller during the lifting process, and is used by the automatic stripping unit.
  • 发布时间: 2018 - 07 - 24
    3.2m2 automatic multi-purpose crane technical parameters
    Zinc electrolysis automatic multi-purpose crane is the key equipment for automatic production of zinc electrolysis. It is mainly used for the tank and anode of the zinc electrolysis workshop, and the trough transfer between the electrolysis tank, the conveying line and the anode trolley. The function of cleaning residual electrolyte and conductive contacts on the electrode plate and finishing the plates is the core equipment of the zinc electrolysis workshop integrating machine (machine), electricity (control) and gas (moving). Our company is the first company in China to successfully develop ...
  • 发布时间: 2018 - 07 - 24
    3.2m2 anode trolley and anode cleaning and leveling unit technical parameters1.4m2 anode cleaning and leveling unit technical specifications and performance indicatorsMain parameters of high pressure water cleaning system
    The anode car and anode cleaning leveling unit in the zinc electrolysis workshop is mainly used for the transfer, cleaning and orthopedics of the anode plate of the zinc electrolysis workshop. This equipment is one of the important equipments in the zinc electrolysis workshop. The zinc electrolysis workshop anode car and anode cleaning leveling unit is mainly composed of anode car, high pressure water cleaning system, anode cleaning and leveling machine, mechanical pretreatment equipment (optional) and so on.Our company is the first enterprise in China to successfully develop anode car and ano...
  • 发布时间: 2018 - 07 - 24
    The zinc casting equipment developed by our company is mainly composed of three main parts: molten zinc induction furnace, ingot unit and palletizing unit. The specific equipment includes: induction furnace, casting device, double-die ingot machine, and ingot conveyor roller. , water-cooled conveyor chain, turning mechanism, zinc ingot grabbing platform, stacking robot (with special fixture), zinc ingot automatic baling device, weighing coding device, ingot conveyor. The equipment has many functions such as melting zinc, casting, ingot casting, palletizing, bundling and weighing.
Contact information 

Phone:0731-83572910

Fax:0731-83572995 

 


Address: No. 16, Lixiang Middle Road, National Economic and Technological Development Zone, Changsha City, Hunan Province

Seeking development in innovation Zhongjin Lingnan Company held the 2018 mid-year work conference

date: 2018-08-14
Times of browsing: 62

On July 28, Zhongjin Lingnan Company held the 2018 mid-year work conference. The meeting summarized the production and operation situation in the first half of the year, analyzed and judged the current economic situation and existing problems, deployed the tasks for the second half of the year, and conveyed the spirit of guangsheng company's production and operation and integration & reorganization symposium in the first half of 2018. The meeting was presided over by Wu Shenghui, deputy secretary of the company's full-time party committee. Liang Ming, vice president, summarized the work in the first half of the year and deployed the work in the second half of the year. Yu Gang, chairman and party secretary of the company, made an important speech at the meeting. The assistant to the president, the party and government of the Shenzhen film enterprise, and the heads of the headquarters departments attended the meeting at the headquarters. The members of the other units of the company participated in the video conference.


The leaders or responsible persons of each business segment, operation management, and safety and environmental protection work made speeches respectively, summed up the production and operation of each sector, the company's operation and management, and safety and environmental protection, and clarified the work ideas and measures for the second half of the year. 


In his speech, Chairman Yu Gang pointed out that in the first half of the year, the company implemented the concept of “seeking development in innovation and solving problems in development”,to “hold the heart and persist in self-confidence; focus on the main business, focus on value; precise management, lean Operation" as the main line, maximizing potential and efficiency, accelerating integration and reorganization, fully defusing various risks, and steadily implementing mergers and acquisitions, achieving good results with economic benefits exceeding the planned goals, showing“stable and good, stable and unforgettable, steady and progressive, and steadily strengthened”.


Chairman Yu Gang stressed that in the second half of the year, the company's development situation is not optimistic. It is necessary to be highly vigilant against the risk challenges faced, but also to strengthen confidence, maintain political strength, and work hard, always aiming at the annual production and operation objectives and key task measures. Adhere to the goal-oriented, problem-oriented, in accordance with the company's unified deployment, pay close attention to the implementation and landing of various measures, to ensure that every measure is sound, and every initiative will deliver results.


Chairman Yu Gang put forward four opinions on the work in the second half of the year. First, it is necessary to “hold the three lines”, that is, to maintain the main line of quality improvement and efficiency development, to maintain the bottom line of safety and environmental protection occupational health, and to maintain the red line of party style and clean government construction. The second is to "achieve three breakthroughs", that is, to achieve breakthroughs in integration and reorganization, to achieve breakthroughs in key areas, and to achieve breakthroughs in reform and innovation; and third, to "strengthen three capabilities," that is, to strengthen the ability to resist risks,strengthen professional capabilities and strengthening the ability of market development; Fourth, we must strengthen party building, grasp theoretical study, grasp grassroots construction, grasp the construction of the team, grasp the implementation of responsibility, and promote the improvement of production and operation efficiency. In response to the next stage of work, Chairman Yu Gang also put forward four requirements for “stable words, real words, first words, and new words”.


In response to the integration and restructuring work, Chairman Yu Gang particularly emphasized that all units and departments should fully recognize the extreme importance of the integration and reorganization work. From the height of politics, strictly implement the requirements put forward by Chairman Xu Guang and General Manager Chen Shengguang of Guangsheng Company, based on the actual situation of Zhongjin Lingnan, and ensure the completion of the “zombie enterprise” clearing work before the end of the year according to the requirements of time and node.


Chairman Yu Gang further pointed out that busy work and failure to implement is "blind busy"; thousands of strokes can not be implemented is "virtuous move"; thousands of articles, not to implement is "white strip", leading cadres shoulder the important mission of decomposing and promoting the company to build a world-class enterprise, and shoulder the heavy responsibility of organizing the work of all units and departments of the company., it is responsible for organizing the work of all units and departments of the company. We should take effective measures to mobilize the enthusiasm, initiative and creativity of all the cadres and staff in our unit, promote the implementation of various work, and truly assume the company's development mission in the new era.

Vice President Liang Ming reviewed the company's work in the first half of the year from six aspects: improving quality and efficiency, preventing risks, implementing slimming and strengthening, promoting coordinated development of the sector, strengthening internal construction and reform, and optimizing overseas asset management and control. At the same time, Vice President Liang Ming pointed out the problems that need to be solved in the next development of the company. First, the pressure to maintain growth and improve efficiency is still high. The control of losses and losses should still be strengthened. Second, the external environment faced by the production and operation of Shaoguan film enterprises is not optimistic; the third is that the zombie enterprises clearing out, “three for one industry” and the separation and transfer of corporate social functions need to be accelerated.


At the meeting, Vice President Liang Ming also conveyed the spirit of the production and operation and integration reorganization meeting of Guangyu Company in the first half of 2018 on July 18, analyzing and judging the current economic situation and development environment, and the specific deployment of the second half of the work from five aspects. First, we will not relax our goals for the whole year. Second, we will not relax our risk management and control. Third, we will not relax our integration and restructuring. Fourth, we will focus on tackling key areas and not relaxing. Fifth, we will focus on innovation and development.   (Source: Zhongjin Lingnan)

在创新中谋求发展 中金岭南公司召开2018年年中工作会议


News /   More>
1
2016 - 05 - 11
From April 21 to 22, the“2016 National Nonferrous Metals Mining and Metallurgy Practical Technology and Equipment Conference”hosted by Changsha Nonferrous Metals Institute was successfully held at the Modern Gloria Grand Hotel in Changsha. This conference is a grand event in the non-ferrous metal industry. It aims to build a platform for mining and metallurgy technology exchanges and promote the upgrading of practical technologies for non-ferrous industries. Kang Yi, Chairman of the China Nonferrous Metals Society, Shang Fushan, Vice President of the China Nonferrous Metals Industry Associatio...
2
2015 - 09 - 20
China's first zinc electrolysis multi-function automatic crane developed successfully
3
2015 - 09 - 20
On April 22, 2014, the company and Sichuan Huili County Zinc Lead and Zinc Smelting Co., Ltd. successfully signed the EPC General Contracting Framework Agreement for 100,000 tons of electric zinc smelting project in Chengdu with a contract value of 1.18 billion yuan. Liao Jiangnan, deputy general manager of the company, signed the agreement on behalf of Chen Huaqiang, chairman and general manager of the company and Huili Lead & Zinc Co., Ltd. Sichuan Wushan State Committee Standing Committee Hu Kun, deputy governor Zhu Xuelei, Huili Lead and Zinc Co., Ltd. Party Secretary Xiao Denghua, Dep...
4
2015 - 09 - 16
At 16:58 on September 26, 2014, the signing ceremony for the EPC project general contracting contract for the 100kt/a electric zinc smelting project of Sichuan Huili County Zinc, Lead and Zinc Smelting Co., Ltd. was held in the conference room of Bohai Hotel, Xichang City, Liangshan Yi Autonomous Prefecture, Sichuan Province. Held this project, the project is actively promoted by the Liangshan Prefecture government for many years. The total contract value reached 1.15 billion yuan (including zinc electrodes with non-fixed price).The signing ceremony was attended by: Wu Kun, member of the Stand...
5
2015 - 09 - 16
Recently, several large trucks filled with cylinder washers and tank washers have slowly sailed to the port of Shanghai and sent to Papua New Guinea. This is our company's three Φ3000mm×10000mm Ruimu nickel-cobalt cylinder washing machine project in 2008 and a Φ2200mm×7500mm Côte d'Ivoire manganese ore cylinder washing machine project in 2010, and once again sent large equipment to foreign countries.In recent years, our company has continued to innovate in technology and has embarked on a new model on the road of independent innovation and research and development. It ha...
Sweep, mobile access
Copyright ©2018 - 2021 Zhongji Sunward Technology Co., Ltd.
犀牛云提供企业云服务